
Demand Driven Material Requirements Planning (DDMRP)
Available
In the 1950s, a planning method was conceived called “Material Requirements Planning (or MRP).” MRP changed the world of manufacturing forever. But times have changed—customer tolerance times are much shorter, product variety and complexity has increased, and supply chains have spread around the world. MRP is dramatically failing in this “New Normal.” Demand Driven Material Requirements Planning ...
Read more
product_type_E-book
pdf
Price
69.95 £
In the 1950s, a planning method was conceived called “Material Requirements Planning (or MRP).” MRP changed the world of manufacturing forever. But times have changed—customer tolerance times are much shorter, product variety and complexity has increased, and supply chains have spread around the world. MRP is dramatically failing in this “New Normal.” Demand Driven Material Requirements Planning ...
Read more
Follow the Author

