Review Criteria for Successful Treatment of Hydrolysate at the Pueblo Chemical Agent Destruction Pilot Plant

Available
0
StarStarStarStarStar
0Reviews

One of the last two sites with chemical munitions and chemical materiel is the Pueblo Chemical Depot in Pueblo, Colorado. The stockpile at this location consists of about 800,000 projectiles and mortars, all of which are filled with the chemical agent mustard. Under the direction of the Assembled Chemical Weapons Alternative Program (ACWA), the Army has constructed the Pueblo Chemical Agent Destru...

Read more
E-book
epub
Price
35.99 £ * Old Price 43.19 £

One of the last two sites with chemical munitions and chemical materiel is the Pueblo Chemical Depot in Pueblo, Colorado. The stockpile at this location consists of about 800,000 projectiles and mortars, all of which are filled with the chemical agent mustard. Under the direction of the Assembled Chemical Weapons Alternative Program (ACWA), the Army has constructed the Pueblo Chemical Agent Destru...

Read more
Follow the Author

Options

  • Formats: epub
  • ISBN: 9780309317917
  • Publication Date: 26 Mar 2015
  • Publisher: National Academies Press
  • Product language: English
  • Drm Setting: DRM