
Sussex Railway Stations Through Time
Available
It was in 1841 that the London & Brighton Railway constructed the line from Norwood (linking with the London & Croydon Railway) to the coast. The lines built between 1841 and 1868 formed a comprehensive countywide network, extending from Three Bridges to Midhurst and Chichester in the west and (via the South Eastern Railway) from Tunbridge Wells to Bexhill, thence to Rye, in the east. The county’s...
Read more
E-book
epub
Price
12.00 £
It was in 1841 that the London & Brighton Railway constructed the line from Norwood (linking with the London & Croydon Railway) to the coast. The lines built between 1841 and 1868 formed a comprehensive countywide network, extending from Three Bridges to Midhurst and Chichester in the west and (via the South Eastern Railway) from Tunbridge Wells to Bexhill, thence to Rye, in the east. The county’s...
Read more
Follow the Author