Time-To-Build

Available
0
StarStarStarStarStar
0Reviews
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry...
Read more
product_type_E-book
pdf
Price
44.99 £
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry...
Read more
Follow the Author

Options

  • Formats: pdf
  • ISBN: 9783642468155
  • Publication Date: 6 Dec 2012
  • Publisher: Springer Berlin Heidelberg
  • Drm Setting: DRM